Thursday, 3 April 2014
Saturday, 29 March 2014
final tidy up
New exhaust from downpipe to back box including cat.
Fans fitted and re-wired to work back with the auto switch's.
CV Joints replaced and front brakes fitted with braided hoses.
New control arms and track rod ends.
Wednesday, 19 March 2014
getting there
After a little issues with the conversion from Air con to non air con with power steering pipes and alternator cables and even water pipes we are considerably closer than we were last week.
Tuesday, 11 March 2014
The engine
Refurbished engine:
New Crank
New bearings
New piston ring
New gaskets
New water pump
New Thermostat
New Oil pump
New power steering pump
New core plugs
New distributor
refurbished sump
New Crank
New bearings
New piston ring
New gaskets
New water pump
New Thermostat
New Oil pump
New power steering pump
New core plugs
New distributor
refurbished sump
Subscribe to:
Comments (Atom)








