Saturday, 29 March 2014

final tidy up

Brakes cleaned up, all nuts and bolts replaced, abs cables secured
 
New exhaust from downpipe to back box including cat.
 
Fans fitted and re-wired to work back with the auto switch's.
 
 
CV Joints replaced and front brakes fitted with braided hoses.
New control arms and track rod ends.
 
 
 
 
 
 
 

Wednesday, 19 March 2014

getting there

After a little issues with the conversion from Air con to non air con with power steering pipes and alternator cables and even water pipes we are considerably closer than we were last week.

Tuesday, 11 March 2014

Out with the old

Old engine had to go to make way for the new one and almost every nut and bolt put up a fight.

 
 
 
 

The engine

Refurbished engine:

New Crank
New bearings
New piston ring
New gaskets
New water pump
New Thermostat
New Oil pump
New power steering pump
New core plugs
New distributor
refurbished sump


Sat in the to do pile

With all the parts stocking up waiting to be next in line.

 
 
Cream Full leather interior