Saturday, 29 March 2014

final tidy up

Brakes cleaned up, all nuts and bolts replaced, abs cables secured
 
New exhaust from downpipe to back box including cat.
 
Fans fitted and re-wired to work back with the auto switch's.
 
 
CV Joints replaced and front brakes fitted with braided hoses.
New control arms and track rod ends.
 
 
 
 
 
 
 

No comments:

Post a Comment